B. Braun Melsungen AG

Overall planning
The PROLIGNIS GmbH & Co. KG in Ingolstadt developed the project at the Melsungen site and subsequently implemented it through the newly established company HHKW Melsungen GmbH & Co. KG.
Th. Arens Anlagenbau GmbH

Overall planning
The Th. Arens Anlagenbau GmbH, as the general contractor, built an ORC biomass cogeneration plant including a peak load center to supply a district heating network in the Craucau district of Magdeburg for the Städtische Werke Magdeburg GmbH.
Rhenanus school
Werra-Meißner-Kreis

Overall planning
A biomass heat plant was installed in the Rhenanus school in Bad Sooden-Allendorf, and the existing heat distribution systems were renovated. Approximately 80% of the energy required for heat generation is provided through locally sourced untreated forest wood chips. This results in the replacement of approximately 100.000 liters of heating oil per year with wood from the region.
Stadtwerke Bielefeld GmbH

Overall planning
For over 150 years, the “Stadtwerke Bielefeld” have been providing comprehensive utility services, including electricity, gas, water, and district heating. In April 2008, the “Stadtwerke Bielefeld” introduced a new ecological energy concept.
Sägewerk Echtle GmbH & Co. KG

Overall planning
The Sägewerk Echtle GmbH & Co. KG operates a sawmill with processing of the produced lumber in Nordrach (Black Forest). The annual volume of roundwood (without bark) is approximately 45.000 fm/a. The demand for dried lumber has significantly increased in recent years, necessitating the company to expand its drying kiln capacity.
Sägewerk Schösswendter

Overall planning
The family Schößwendter operates a sawmill at its site in Saalfelden. Due to the increased heat demand, a comprehensive concept for future heat supply has been developed.
ESWE Bioenergie GmbH

Overall planning process engineering and project management
In 2008, SEEGER ENGINEERING was commissioned by the ESWE BioEnergie GmbH to carry out the complete process engineering design of a biomass heat and power plant based on the fuel of waste wood, as well as the project management for the entire project.
Eslohe school center

Overall planning
A wood-fired heating system was installed to heat the Eslohe school center, which also supplies nearby properties such as the spa house, a senior care facility, and an indoor swimming pool with heat.