Our projects have
many faces

For more than 40 years, the team of SEEGER ENGINEERING has already been working succesfully in the market of energetic use of solid biomass. From the customer’s point of view, a realized project is measured by the technical functionality of the plant, its sustainable economic efficiency and a maximum of added value. We see ourselves as neutral and independent project managers and offer you services starting with project development, through planning and financing, and beyond to post-commissioning support.

.

We would be delighted to present you with an excerpt of our implemented projects. Further references and reference lists are available on request.

Overall planning

The PROLIGNIS GmbH & Co. KG in Ingolstadt developed the project at the Melsungen site and subsequently implemented it through the newly established company HHKW Melsungen GmbH & Co. KG.

Overall planning

The Th. Arens Anlagenbau GmbH, as the general contractor, built an ORC biomass cogeneration plant including a peak load center to supply a district heating network in the Craucau district of Magdeburg for the Städtische Werke Magdeburg GmbH.

Overall planning

A biomass heat plant was installed in the Rhenanus school in Bad Sooden-Allendorf, and the existing heat distribution systems were renovated. Approximately 80% of the energy required for heat generation is provided through locally sourced untreated forest wood chips. This results in the replacement of approximately 100.000 liters of heating oil per year with wood from the region.

Overall planning

For over 150 years, the "Stadtwerke Bielefeld" have been providing comprehensive utility services, including electricity, gas, water, and district heating. In April 2008, the "Stadtwerke Bielefeld" introduced a new ecological energy concept.

Overall planning

The Sägewerk Echtle GmbH & Co. KG operates a sawmill with processing of the produced lumber in Nordrach (Black Forest). The annual volume of roundwood (without bark) is approximately 45.000 fm/a. The demand for dried lumber has significantly increased in recent years, necessitating the company to expand its drying kiln capacity.

Overall planning

The family Schößwendter operates a sawmill at its site in Saalfelden. Due to the increased heat demand, a comprehensive concept for future heat supply has been developed.

Overall planning process engineering and project management

In 2008, SEEGER ENGINEERING was commissioned by the ESWE BioEnergie GmbH to carry out the complete process engineering design of a biomass heat and power plant based on the fuel of waste wood, as well as the project management for the entire project.

Overall planning

A wood-fired heating system was installed to heat the Eslohe school center, which also supplies nearby properties such as the spa house, a senior care facility, and an indoor swimming pool with heat.